在python中使用正则表达式multiline在两个子字符串之间提取文本

2024-10-04 03:16:01 发布

您现在位置:Python中文网/ 问答频道 /正文

我想使用python使用正则表达式在两个子字符串或短语之间提取文本

示例文本:

NAME – Testing set ADDRESS – 1470 ROAD CONTACT NUMBER - +91-44578558774 E-MAIL – test.side@gmail.com 


PROFESSIONAL PROFILE 

A petroleum graduate with professional experience in workover operation & Surface Well Testing operation and implementation of procedures and best practices following knowledge management processes. Seeking a role in oil and gas industry to develop engineering and management skills and apply new ideas to real life industry problem. 


PROFESSIONAL EXPERIENCE 

RIG (JUN 2014 – SEPT 2015)  

Performed various workover operations in SRP and ESP wells developed in Ahmedabad (ONGC Project) & Durgapur (ESSAR Project). My responsibilities as Roustabout on Rig was to perform:  Make pipe connection & Operate Tongs while running in and Pull out of Sucker rod & Tubings.

CORE COMPETENCIES: 

1. Well versed with varioussoftware for well testing (Wireless software). 2. Good Knowledge of MS-EXCEL, MS-Word.

正则表达式用于提取专业配置文件核心竞争力? 我无法正确使用正则表达式


Tags: andoftoin文本projectwithtesting
1条回答
网友
1楼 · 发布于 2024-10-04 03:16:01

要从评论继续…请尝试将此作为演示

import re

pattern = re.compile(r'PROFESSIONAL PROFILE([\s\S]+)CORE COMPETENCIES:')

data = '''
NAME – Testing set ADDRESS – 1470 ROAD CONTACT NUMBER - +91-44578558774 E-MAIL – test.side@gmail.com 


PROFESSIONAL PROFILE 

A petroleum graduate with professional experience in workover operation & Surface Well Testing operation and implementation of procedures and best practices following knowledge management processes. Seeking a role in oil and gas industry to develop engineering and management skills and apply new ideas to real life industry problem. 


PROFESSIONAL EXPERIENCE 

RIG (JUN 2014 – SEPT 2015)  

Performed various workover operations in SRP and ESP wells developed in Ahmedabad (ONGC Project) & Durgapur (ESSAR Project). My responsibilities as Roustabout on Rig was to perform:  Make pipe connection & Operate Tongs while running in and Pull out of Sucker rod & Tubings.

CORE COMPETENCIES: 

1. Well versed with varioussoftware for well testing (Wireless software). 2. Good Knowledge of MS-EXCEL, MS-Word.

'''

#print(pattern.search(data)[1])
#I think the  is tripping the code up so consider...
print(pattern.search(data)[1].encode('utf8'))

产出:

A petroleum graduate with professional experience in workover operation & Surface Well Testing operation and implementation of procedures and best practices following knowledge management processes. Seeking a role in oil and gas industry to develop engineering and management skills and apply new ideas to real life industry problem. 


PROFESSIONAL EXPERIENCE 

RIG (JUN 2014 – SEPT 2015)  

Performed various workover operations in SRP and ESP wells developed in Ahmedabad (ONGC Project) & Durgapur (ESSAR Project). My responsibilities as Roustabout on Rig was to perform:  Make pipe connection & Operate Tongs while running in and Pull out of Sucker rod & Tubings.

相关问题 更多 >